- Preparation of a concession application for prospection and exploitation of thermal water in Białka Tatrzanska, including a geological well design (PRG) for drilling the Białka Tatrzanska GT-1 well to 2500 m depth.
- Obtainment of prospection and exploitation concession in 2007 for geothermal waters via the Białka Tatrzańska GT-1 well.
- Supervision of the project and coordination of the drilling operations for the exploratory and reconnaissance well, the Białka Tatrzańska GT-1, to 2500 m TD.
- Preparation of hydrogeological documentation and submission of a licence application for the exploitation of thermal water deposits via the Biała Tatrzańska GT-1 well.
- Preparation of business plan for the Bania Water Park in Biała Tatrzańska, in support of an application for funding from the Innovative Economy Programme.
- Preparation of a feasibility study and project proposal for the utilisation of geothermal water by the Termy Bania facility. www.termabania.pl
- Supervision of seismic surveys over the reservoir and determination of the optimal trajectory for the Białka Tatrzańska GT-2 well.
- Preparation of the geological well desigh project, and obtainment of approval for the project from the relevant authorities.
- Obtainment of funding for the investment project, namely: The drilling of the geothermal well at Białka Tatrzańska GT-2, along with the expansion of the heating plant to include compressor-based heat pumps, funded under the 1.1.1 sub-section of national environment fund. The programme also supports investments in renewable energy generation, including the connection of these sources to the distribution and transmission networks. This is in line with the Priority Axis of the Operational Programme Infrastructure and Environment for the 2014-2020 period, which aims to reduce the emissions intensity of the economy.
- Assistance with the reimbursement of funding obtained under Sub-Action 1.1.1.
- Supervision and monitoring of drilling and testing of the Białka Tatrzańska GT-2 well, including the preparation and approval of the hydrogeological documentation defining the exploitable volume of the thermal water.
- Preparation of the geological well design, including Marshalls office approval for the project – Białka Tatrzańska GT-3




