- Geologic and drilling supervision of Sieradz GT-1 well, which is 1505 metres deep and located in Sieradz.
- Preparation of a geologic report on the Sieradz GT-1 exploratory and production well.
- Preparation of a hydrogeological documentation establishing the exploitable resources of the Sieradz GT-1 thermal water reservoir in Sieradz, in conjunction with approval of this documentation by decision by the Marshal of the Łódź Voivodeship.
- Development of a construction and technical concept for a geothermal-biomass combined heat and power plant with a cogeneration module.
- Obtaining EU funding for the following projects:
- Construction of a geothermal and biomass combined heat and power plant in Sieradz, including the Sieradz GT-2 injection well
- Construction of a cogeneration module to support the operation of the geothermal-biomass heating plant in Sieradz.
- Development of design for “Construction of a geothermal and biomass combined heat and power plant in Sieradz” along with securing a construction permit. The project included following tasks:
- Construction design preparation for “Construction of a geothermal and biomass heating plant in Sieradz with the Sieradz GT-2 injection well”, in accordance with the relevant regulations and standards.
- Preparation of detailed engineering designs for the project. “Construction of a cogeneration module to support the operation of the geothermal-biomass heating plant in Sieradz” along with related studies.
- Preparation of hydrogeological documentation defining the hydrogeological conditions associated with planned brine reinjection into the Sieradz GT-2 well, and obtainment of approval decision by the Marshal of the Łódź Voivodeship.